FERRETTI YACHTS 670 TEAK DECKING

overview


The Ferretti Yachts 670 arrived in the UAE with no factory-fitted teak deck, and we were commissioned with the task of fabricating and installing a new deck onboard this 67 ft luxury yacht. We sourced and used Burma double A Teak, which took us 3 weeks to produce each piece and 1 week for installation.

SCope of work

TEAK DECKING

BEFORE
Bow Area
AFTER
Bow Area
BEFORE
Flybridge
after
Flybridge
BEFORE
Starboard
after
Starboard
BEFORE
Portside
AFTER
Portside