overview

The Riva 85 Opera arrived at Marine Services One for a brand-new teak decking.

Our skilled team removed the old and worn teak of this 86 ft yacht and then began preparing custom-cut teak to fit the yacht’s elegant lines perfectly. Each plank was carefully crafted and installed to provide a fresh, durable, and stylish upgrade that complements the yacht’s luxurious design. With this meticulous teak replacement, the Riva 85 Opera is now equipped with a robust and beautiful deck.

SCope of work

TEAK DECKING

INSPECTION OF OLD TEAK
STAGE 1

The old teak deck was inspected for its overall condition.

SHEET TEMPLATE OF TEAK
STAGE 2

A sheet template was created for every piece of new teak required.

REMOVAL OF OLD TEAK
STAGE 3

Once the template was cross-checked against the old teak, it was scrapped off and removed completely.

SANDING THE DECK
STAGE 4

The deck was sanded down and filled out with epoxy to make it leveled.

FABRICATION OF THE NEW TEAK
STAGE 5

New teak was fabricated based on the MDF templates and 100 m2 of the deck was covered with new teak. 

Application of caulking
STAGE 6

Teak primer was added in, and then the 290 DC Sikaflex in black was applied.

INSTALLATION OF NEW TEAK
STAGE 7

The deck was cleaned with acetone and the 298 Sikaflex was applied to the new teak pieces which act as a bounding agent. Once stuck together, the new teak pieces were placed onto the deck.

Bounding of teak pieces
STAGE 8

Once the teak pieces were aligned together correctly, 290 DC Sikaflex was applied to the boarders of the teak for a clean finish.

NEW TEAK DECK
STAGE 9

The new teak was sanded down with grid 300 sanding paper and then washed for a smooth finish.